Voeg je koptekst hier toe

A sound design forms the essential foundation for successful drilling or pressing. Our engineers maintain direct contact with our project managers, foremen, and drilling supervisors.

What does Engineering do?

All designs are checked on-site for technical feasibility. This includes consideration of existing cables and pipes, the space required for setting up the drilling equipment, and the pipes to be pulled in.

The work of our engineers

Engineering also considers the traffic regulations and other measures to be implemented to ensure the drilling or pressing process can be carried out safely. This creates a comprehensive design tailored to the client’s wishes, the regulations of the relevant authorities, and the surrounding environment.

The work of our team of engineers consists of:

  • Design drawings for HDD drilling, pilot-controlled auger drilling and steel pressing
  • Layout drawings
  • Drawings of required explanation of route and catback construction
  • Revision drawings based on GPS – measurements by the drilling crew
  • Drilling mud pressure calculations for HDD drilling
  • Traction force calculations for HDD drilling
  • Pressure force calculations for (pilot-controlled) auger drilling
  • Geotechnical research
  • KLIC – reporting and processing of information in the design drawing
  • Complete drilling plan (work plan)
  • R.I.E.
  • V&G – sub-plan
  • Permit application to ProRail, Rijkswaterstaat, province and water board
  • Drawings, calculations and work plans for innovative solutions
  • Drawings, calculations and work plans in the tender phase
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.